Caspian Sunrise PLC
("Caspian Sunrise" or the "Company")
BNG operational update
The Board of Caspian Sunrise are pleased to provide the following update.

BNG

Shallow Wells

Production levels

Total oil production in October 2018 from the 5 wells operational in the MJF structure and the 4 wells in the South Elemes structure was 54,348 barrels (average of 1,753 bopd).

Completed workovers

The remedial work completed at the start of October 2018 has resulted in Well 142 returning to production at the rate of approximately 90 bopd, with only 1-2% water content, using a 5mm choke.

Active workovers

Well 146 is currently undergoing workover operations using a similar approach to that successfully used in restoring production to wells 143 and 142

Planned workovers

At Well 808, on a potential new structure, the preparatory work to reperforate and test is now complete. The procurement of the required tubing has commenced and work is set to start once the workover rig now in use at Well 146 becomes available.

Move to full production status

The planned move of the MJF structure to full production status is expected to become effective in 1Q 2019. Of the 54,348 barrels of oil produced in October 2018, 46,946 barrels were from the MJF structure. Under our existing license this production must be sold by reference to domestic prices. In recent months the Company achieved approximately $16 per barrel net of all costs for domestic sales.

Our expectation is that following the move to full production status the price achievable on export sales net of all taxes and production related costs will be of the order of $35 - $40 per barrel.

We have also identified the site for new shallow production Well 147 to be drilled on the MJF structure shortly after the receipt of the MJF structure's full production status.

Deep Wells

Deep Well A5

Deep Well A5 Sidetrack-2 (A5 ST-2) has a total depth of 4,450 meters. The pre-salt carbonate reservoir is perforated over a 105 meter interval (4,332 to 4,437 meters). Milling operations to remove a metal obstruction in the well continue to progress at a current depth of 4,054 meters.

As previously announced, for the 15 days between 23 October and 27 November 2017 prior to the formal start of 90 day testing, the well flowed at the rate of approximately 3,800 bopd before being restricted by a partial blockage. Our intention is to restart the 90-day flow test once wellbore is clear of obstructions.

Deep Well 801

The pressure build-up in Deep well 801 since Caspian's last update has been steady, exceeding the Company's initial expectations, and now stands at approximately 360 ATM (5292 psi). Procurement of services are underway for re-perforation and acid fracture jobs to be followed by a 90-day flow test.

Deep Well A6

As previously announced, the Company continues to work on a detailed recompletion plan while waiting for equipment in use at A5 and 801 to become available.

New Contract for up to a further 3 deep wells

The Company has entered into a contract with a leading international drilling company for up to three new deep wells, A8, A9 & A10. Under the contract the leading international drilling company will be responsible for the first phase of drilling with Caspian Sunrise taking over for the more complicated final phase through the salt layer and the high pressure and high temperature zones expected below the salt layer, until the well reaches total depth.

The Company has decided to enter into this arrangement in order to take advantage of the relatively low market rates for the typically straight forward drilling down to the salt layerand then further utilise the Company's knowledge of sub-salt drilling from the experience gained in the three previous BNG deep wells (A5, A6 & 801).

The first well to be drilled under this contract, Deep Well A8, is planned to spud during November and to a planned Total depth of 5,300 meters. The well is located approximately 1 km up structure from Deep Well A5 and will target the same pre-salt carbonates that were successfully identified in the Deep Well A5. We also plan to evaluate deeper carbonate targets of Devonian to Mississippian ages.

The first 4,100 meters of the well will be drilled by our international partner with the final 1,200 meters to be drilled by Caspian Sunrise, using local contractors.

게시글 찬성/반대

  • 0추천
  • 0반대
내 아이디와 비밀번호가 유출되었다? 자세히보기 →

운영배심원의견

운영배심원 의견?
운영배심원의견이란
운영배심원 의견이란?
게시판 활동 내용에 따라 매월 새롭게 선정되는
운영배심원(10인 이하)이 의견을 행사할 수 있습니다.

운영배심원 4인이 글 내리기에 의견을 행사하게 되면
해당 글의 추천수와 반대수를 비교하여 반대수가
추천수를 넘어서는 경우에는 해당 글이 블라인드 처리
됩니다.

댓글목록

댓글 작성하기

댓글쓰기 0 / 1000

게시판버튼

광고영역

하단영역

씽크풀 사이트에서 제공되는 정보는 오류 및 지연이 있을 수 있으며, 이를 기반으로 한 투자에는 손실이 발생할 수 있습니다.
그 이용에 따르는 책임은 이용자 본인에게 있습니다. 또한 이용자는 본 정보를 무단 복사, 전재 할 수 없습니다.

씽크풀은 정식 금융투자업자가 아닌 유사투자자문업자로 개별적인 투자상담과 자금운용이 불가합니다.
본서비스에서 제공되는 모든 정보는 투자판단의 참고자료로 원금 손실이 발생될 수 있으며, 그 손실은 투자자에게 귀속됩니다.

㈜씽크풀 서울시 영등포구 국제금융로 70, 15층 (여의도동, 미원빌딩)

고객센터 1666-6300 사업자 등록번호 116-81-54775 대표 : 김동진

Copyright since 1999 © ThinkPool Co.,Ltd. All Rights Reserved